DUM hotel is situated in the side strip of the Capital City of Prague - in a peaceful city part of Modřany with a good and fast traffic connection with the historical center of the city using a public transportation. Nearby there are several forest parks. With regards to its location and the arrangement of rooms as suites is suitable both for accommodation of tour travelers within the frame of an organized group tourism and also for the needs of the individual private and business clients. The design of the rooms is suitable also for the accommodation of parents with the children. Children aged to 12 years are accommodated free of charge.
The hotel also meets the needs of those guests, who are accompanied in their trips with their pets.
The safety of our guests is our priority, that is why it is provided by a professional security agency. The rooms are secured with the electronic locks. The safety features include fire fighting measures. The hotel is equipped with the smoke detectors in all rooms as well as in all social premises, the individual hotel rooms are separated from staircase and elevators by fire-resistant doors.
Apart from the offer of accommodation and board the hotel offers leisure options, such as tennis courts, a squash hall, bowling, golf course, fitness center, massages, solarium, shopping center, pizzeria, movie-theatres, casinos. All of this equipment is within a short distance.
The DUM hotel has been included in the three-star category ***. The requirements for the standard of equipment and the provision of services gradually grow in this category of a hotel as well. In order to keep the standard, the hotel goes through refurbishments and renovations, which have as its goal to continue in the improvement of the equipment of social rooms, hotel rooms, level of the technical equipment, upgrade and improvement of the services for the hotel guests. First, reconstructions of technological networks in the rooms have been performed followed by a complex refurbishment and additional development of the restaurant space, which thus grew to a double as opposed to the original condition. This reconstruction included the equipment of all restaurant areas with air-conditioning. In 2006, a modernization of all rooms has been completed, consisting in the reconstruction of sanitary installations and bathrooms, laying of new carpets and replacement of movable furnishings. Within the frame of the reconstructions, modernization and renovation of elevators have been performed, the last stage of which, which concerns only the modernization of the technical facilities will take place this year resulting in the increased safety of the hotel guests. The fact, that the modernizations do not occur only inside the hotel, is well documented by the new paving of the area outside the hotel, including the roofing. Of course, the reconstruction and modernization continue also in this year. From the guest´s point of view, the reconstruction of the staircase is the most visible. All these activities would not however not bring the desired effect, if it were not for the constant improvement of the work of the hotel employees and their approach to the hotel guests. That is why, the employees undergo regular training in compliance with the quality control system requirements.